We are building our home in the Eastern suburbs of Melbourne. The house was designed with energy efficiency in mind. The aim is to achieve low running costs. We purchased half of a block which was subdivided in a "battle-axe" configuration. There is an existing house at the front, near the street.
The guys did an excellent job: they made sure they protected the concrete floor,
as well as the windows, and the workmanship is first rate.
We have been extremely lucky with the weather!
The trusses were delivered Monday late afternoon.
The truck got bogged down in the driveway, had to be pulled out using another truck and in the process, the new meter box was slightly dented…
The next day, work began again, and within 3 days, trusses and battens were in place, well almost. On Friday, the weather put a stop to everything: heavy rain, hailstorm, the lot.
In typical
Once the battens are in place, the “roof man” (!) should turn up and take some measurement. We should see some Colorbond very soon on top of the first floor.
We are very pleased with the quality of the work so far.
Attention to detail is omnipresent, and it's a very reassuring thing!