14/03/08 Crushed rock, form work, termite spray, plastic membrane almost completed.
18/03/08 Waffle pods, steel mesh & reo are in place, ready for the pour.
19/03/08 The Big Day! All the guys are here, ready for action. Perfect
We are building our home in the Eastern suburbs of Melbourne. The house was designed with energy efficiency in mind. The aim is to achieve low running costs. We purchased half of a block which was subdivided in a "battle-axe" configuration. There is an existing house at the front, near the street.
No comments:
Post a Comment